8x H100 node
h100-xlargeAll eight GPUs first attested on 10 September 2026; attested again on 4 November 2026, with the Intel TDX quote in the same bundle.
- Intel TDX quote, captured on 4 November 2026 from 22:28 to 22:31 UTC inside a tenant VM (h100-xlarge): version 4, 4,936 bytes, not a debug trust domain, platform TCB rated UpToDate by Intel, report_data equal to the SHA-512 of the run's manifest.
- NVIDIA's remote attestation service (NRAS) returned "Attestation Successful" for all eight GPUs, on a nonce drawn outside the VM: measurements success, secure boot on, debug disabled, driver 595.71.05, VBIOS 96.00.CF.00.01.
- The quote and the GPU tokens sit in one voltage-verify bundle, verified outside the VM, online and offline; the same bundle under another challenge is rejected.
- Each GPU reports 82,542,720 KiB of protected memory and 0 KiB unprotected.